Material

Material for the struts, the crane, all the bolts, and the sheets for the covering was free. All the angle iron came as shipping brackets on equipment I was installing at my last job; I was lucky to able to get it.



The sheets were donated by a friend. The only material cost was dye for the sheets, zip ties, paint and fender washers, all of which totaled just over $100. A lot of money was spent on consumable goods such as: cut off discs, a new grinder, and food for the crew.





I know I got incredibly lucky having the metal given to me; the dome would not have been built without it. However I find that opportunity is where you make it, it doesn't just happen.

Next ⇒ ...Construction Photos

Back ⇐ ...Time

Orbbject    Lost Machine