I have the Dive Train frame welded up with the Cog and rollers mounted. Which means we are still on schedule for February. There will be a whole lot added to the Ship in March with the construction of the Ship Frame. I’ll need to sell 6 more Tripods to buy the rest of the material for the frame. Unfortunately it is the “rest” of the material that is needed first. I have enough material to keep me busy for a week, but after that without some help things will stop. Lets see if we can sell some Tripods.
About Pirate Ship
Welcome to the Construction Blog of the Pirate Ship. I plan to have it done for Burning Man 2010 as time and material present themselves. I am trying to use as much recycled and reused material as possible. Some things I will have to buy, for that we are making and selling Tripod-Sentinels. Please Visit the main page to lean more.
LostMachine.com
You can also learn more about the Tripods on their FaceBook Page.


LostMachine.com
0 Responses
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.
You must be logged in to post a comment.