Last weekend started the construction of the Drive Train Frame. This is the bit that the motor, gearbox, Cog, guide rollers….and the rest of the ship will be attached to.
With four pieces cut we were able to throw some bits into place and get an idea of the scale of what we are working with. It is always helpful to see these type of mock ups.
The first pieces were cut from 4x4x1/4 box tubing. The cross member required some unique coping and chamfering.
They were torch cut then cleaned up with a belt grinder and angle grinders.




Welcome to the Construction Blog of the Pirate Ship. I plan to have it done for Burning Man 2010 as time and material present themselves. I am trying to use as much recycled and reused material as possible. Some things I will have to buy, for that we are making and selling Tripod-Sentinels. Please Visit the main page to lean more.
LostMachine.com
0 Responses
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.
You must be logged in to post a comment.