Skip to content

Categories:

Hollow Structural Steel (HSS)

The design and construction of the Ship has been a largely based on what materials I could salvage. Due to the complexity of the wheel that material had to be purchased. I was starting to get afraid that I would need to purchase the material for the frame around the drive train. In my sketches I had designed it as 4inch by 4inch steel tubing but I was ready to change the design for any material that would work.

This past week it just so happens I was given 46 feet of this 4x4x1/4 inch material. It is a little bit rusty but will work well. Aaron and I spent some time with a wire cup brush and some big grinders cleaning the rust off.

IMG_3520

We can now move forward with the frame.

This will take a lot of heavy stick welding (SMAW). I am looking forward to some beefy welds.  I am also playing with the idea of upgrading my welding table for the frame construction.

Main wheel 20090928

Posted in Progress.


0 Responses

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

You must be logged in to post a comment.