I have a lot more done on the Frame. The Captain’s Cabin is framed up. The triangular truss at the edges has been welded in. The wheel made a few revolutions before the spider coupler broke. It broke under a load much lower than what it was rated for. It was a defective part but I now have lost my confidence in that type of coupler. This is a set back but I think the new design will make for a more robust drive train, and it is better that things break early before too much is invested in their success.
One Response
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.
You must be logged in to post a comment.



Welcome to the Construction Blog of the Pirate Ship. I plan to have it done for Burning Man 2010 as time and material present themselves. I am trying to use as much recycled and reused material as possible. Some things I will have to buy, for that we are making and selling Tripod-Sentinels. Please Visit the main page to lean more.
LostMachine.com
Give yourself as much mechanical advantage as you can afford. The less torque on your motor(s) the better…better to be a little slow on-playa than smoking your motors/batts/stuff running undervoltage/overloaded.
Lets talk more about your drive sometime w/ a beer or two. I have some thoughts about hydraulic/electric drive.
Lookin’ sharp!